Install the pressure sewer system including the functioning components, connect supply to the pumps and test electrical operation at completion of installation. We will fill the unit with water for a test run, using a generator if no power is available, and then leave the system in normal operational mode.
The control panel will be locked on completion, so your electrician may have to contact us before they install the final dedicated circuit. If the dedicated circuit is already in place, we will connect and test using the house supply.
When work is complete, we will notify the applicant to arrange the remainder of the electrical installation.