If there is no subdivision proposed for a residential dual occupancy or granny flat, and more than one metered service is required you can apply for an additional meter.
Our additional metered options include:
- One (1) additional standard 20mm metered service (so that each unit/dwelling has its own separate service)
- One (1) 25mm metered service
- 25mm service line with manifold (2 x 20mm meters)
Subdivision requirements
When a Torrens title subdivision is proposed, each dwelling/unit within the property boundary must have a separate standard 20mm meter.
Strata, community and neighbourhood title subdivisions also require individual meters, but these meters can be configured on a manifold.
Metered service connection requirements will be stated on your water development notice. If you do not have a water development notice, please contact us on (02) 4429 3214.
Please note: All meters connected to a property will be charged availability and water usage. Review our metered services comparison guide showing ongoing annual charges.
Steps to apply
Click on the below tabs to find out what you need, how to apply, and what happens next.